QEW Burlington Bay Skyway
Ministry of Transportation Contract #2024-2011
Lane Closures & Detours
1. Tuesday, April 7 → Wednesday, April 8
- Two (2) of four lanes (left lanes) closed 9:00 PM (Apr 7) – 6:00 AM (Apr 8)
- Location: From north of the Skyway Bridge, including the bridge.
- Full closure of all lanes on the Skyway 10:00 PM (Apr 7) – 6:00 AM (Apr 8)
- Alternate route: QEW Niagara‑bound Collectors → Eastport Drive.
Additional Notes:
-
- The ramp from Eastport Drive / Collector lanes to the bridge will be closed during all of the above closure times.
- All ramps at the Northshore Blvd Interchange will remain open.
- Eastport Drive will remain fully open as an alternate route to re‑enter the QEW Niagara bound.
Rain Date: Wednesday, April 8 at 10:00 PM → Thursday, April 9 at 6:00 AM.
2. Wednesday, April 8 → Thursday, April 9
- Two (2) of four lanes (left lanes) closed 9:00 PM (Apr 8) – 6:00 AM (Apr 9)
- Location: From north of the Skyway Bridge, including the bridge.
3. Thursday, April 9 → Friday, April 10
- Two (2) of four lanes (right lanes) closed 11:00 PM (Apr 9) – 6:00 AM (Apr 10)
- Location: From north of the Skyway Bridge, including the bridge.
4. Friday, April 10 → Saturday, April 11
- Two (2) of four lanes (right lanes) closed 11:00 PM (Apr 10) – 6:00 AM (Apr 11)
- Location: From north of the Skyway Bridge, including the bridge.
NOTE: all lane closures are subject to change and are weather dependent.